Administration and production building syNeo cosmetics

PrizeHonorable Mention in Architectural Design / Industrial Buildings
Firm LocationGöppingen, Germany
CompanyGaus Architekten
Lead ArchitectChristian Gaus
Design TeamStructural engineering: Hagedorn Engineers // HLS planning: Mohr Solutions Ingenieure GmbH // Electrical planning: Electroplan Engineers Ltd. // Fire protection: INTEGRIS // Measurement: Surveyor's office Mayer & Jahn GbR // Soil expertise: BWU Remediation Technology GbR // Plan author: Gaus Architekten // Photography: Oliver Rieger
ClientBrunner Besitz Gbr

Now in its third generation, syNeo cosmetics is experiencing strong growth. As the existing company headquarters did not offer sufficient capacity for further development, a sustainable and future-oriented company location was developed in collaboration with the Brunner family. The administration building with storage and production areas combines modern working environments with the high hygiene standards required for cosmetics manufacturing. A extensively greened roof enhances the microclimate and ecology, while photovoltaic systems supply the building with electricity.