Cristo Rey St. Martin – Phase II

PrizeHonorable Mention in Architectural Design / Restoration & Renovation
Firm LocationChicago, United States
Project locationWaukegan, Illinois, USA
CompanyJGMA
Lead ArchitectJuan Moreno
Design TeamJUAN MORENO, AIA | design principal; DAN SPORE | project manager; LAURA FLORES, AIA | project architect; MARIA MONTEAGUDO | project designer
ClientCristo Rey St. Martin

The renovation and construction assignment of Cristo Rey St. Martin College Prep required the comprehensive transformation of an abandoned big box store into a contemporary educational facility serving over 400 students. The former building structure had no identity and no physical or emotional connection to the community. The design build team developed an innovative design that inspire the students, faculty, administration, and community. The expectation of CRSM students is already elevated to that of a college student; therefore, they deserve a facility that emulates this. The new facility